Altona Beach Renourishment, VIC

Altona Beach Renourishment, VIC

AW Maritime were engaged for the design of the Altona Beach Renourishment in an area of the beach which was depleted. The design included determining the optimal crest height of the beach and a suitable slope while considering storm surge levels and climate change. The design was based on 1:50 year storm event. The design was modelled in SBEACH to predict the response of the beach to the design storm event. The renourishment was designed around existing rock groynes and stormwater outfalls. AW Maritime produced a design report, drawings and technical specifications as part of the deliverables.

Client: Hobson Bay City Council

Subscribe To Our Newsletter