Detailed design documentation for reconstruction of Fort West Beacon Tower
AW Maritime were engaged to prepare the tender design drawings and specification for the reconstruction of the Fort West Beacon Tower in Queenscliff, Victoria. This included preparing a demolition plan for removal of existing tower, determining an appropriate tower layout to minimise slope of access stairs to platform and optimising the tower footprint.