AW Maritime teamed with SMC Marine in the design and construction of a new 300 tonne travel lift to replace the existing travel lift facilities at Hervey Bay. AW Maritime was responsible for the detailed design of marine structures and hardstand area.
A 270-tonne barge was recently lifted on the new ship lift as reported in the Fraser Coast Chronicle online – 09 June 2016. Read the full article here.
Click here to view more Maritime Structures projects
VIDEO: Watch a 270 tonne barge lifted in seconds.
Subscribe to our Email Newsletter