Bolte Bridge Lateral Mark, VIC

Bolte Bridge Lateral Mark, VIC

Detailed design of new lateral mark

AW Maritime were engaged for engineering services relating to replacement of an existing damaged lateral mark near the Bolte Bridge in Docklands, Victoria. The scope for new lateral mark designed included:

  • Review loading including wind, wave and currents
  • Review geotechnical condition
  • Determine base pile size and embedment.
  • Prepare brief design report
  • Prepare design and drawings in accordance with relevant standards.

Client: Port of Melbourne

Subscribe To Our Newsletter