AW Maritime were engaged to undertake a structural survey of the seawall at Bullock Island, Lakes Entrance, Victoria and prepare a remediation design for an existing seawall. The scope is currently ongoing and includes:
- Structural inspection
- Seawall stability assessment
- Basis of Design report
- Concept designs
- Detailed design
- Tender documentation
- Construction phase support