AW Maritime (formerly AWC) were engaged to undertake an engineering study related to improvements to the gangway tower at Gellibrand Pier. This involved a review of existing geometry of tower to determine maximum gangway slopes, undertake structural analysis to evaluate residual capacity, review options to increase and extend the tower.