
Detailed design of boat ramp upgrade
AW Maritime completed the detailed design of a new four-lane, 40-metre-long concrete ramp which replaced the old 32.5-metre-long structure. The design, which also includes a connecting walkway between the new boat ramp and a widened floating pontoon provides for greater functionality and direct access for the launching and retrieving of boats.
Photos courtesy of Simpson Construction Company.


