AW Maritime completed the upgrade of Indented Head Boat Ramp on the Bellarine Peninsula in Victoria. Our scope included the following:
- Obtain feature survey
- Desktop review of existing information
- Concept design sketches to ensure compliance with AS3962 and improve launching
- Cost estimates
- Design development after community feedback
- Construction drawings
The final solution included a combination insitu and precast panel ramp, with an alongside sheetpile wall installation, new concrete path and upgrades to the existing jetty.