Detailed design for jetty rehabilitation
AW Maritime have been engaged by SMC Marine to provide a detailed design for the Port Welshpool Jetty Rehabilitation project.
A section of around 600 metres of the existing structure will be demolished and AW Maritime’s design includes a new structure to replace the demolished section comprising of timber piles and crossheads with a composite steel beam and concrete deck.
A detailed update on the project can be found on the South Gippsland Long Jetty Rehabilitation project page.