AW Maritime were engaged to undertake a condition assessment and risk assessment of the Portarlington bluestone seawall on the Bellarine Peninsula. Following this work, AW Maritime recommended remediations works which were designed with a 5-year design life. The remediation design included repair to concrete footings, replacement of bluestone facing clocks, repointing around blocks and rock bag erosion protection.