AW Maritime were commissioned to design and assess timber seawall along St Leonards on the Bellarine Peninsula, Victoria. The new design timber seawall has a minimum of 25-year design life. AW Maritime determined that the most efficient methodology was to build the wall in front of existing alignment. The scope of work that was included was to remove the existing marine timbers that identified for replacement and disposal offsite, placing and fixing of replacement marine timbers, and recovering facilities on the jetty deck including kerbing, light poles, handrails, etc. for reuse.