AW Maritime completed the detailed design for the timber seawall reconstruction at St Leonards at two sites – the Yacht Club and Caravan Park. The design included the installation of 6m pile lengths, geotextile, backfill and timber boards in front of the existing wall which was documented in a design report. AW Maritime produced detailed drawings and the Bill of Quantities (BoQ). We then provided construction support through site inspections, technical advice and issued the certificate of practical completion for the project.